Scandinavian Site Qualification Request

Overview

The following documents and information form the basis of the Scandinavian request to be approved for Series Barrel Module Production.
They are provided below following the format given in the "Barrel Module Assembly Site Qualification Procedures and Criteria" [word doc]
 

1. Named Personnel for the Scandinavian Barrel Module project

Cluster Responsible:   

B. Stugu

Cluster Quality Control:   

Richard Brenner   

Qualified teams exist for module assembly (Oslo) and metrology (Uppsala) and electrical testing (Bergen, Oslo and Uppsala):

Bergen   

Arne Solberg, Bjørn Pommeresche, Ola Øye, Bjarne Stugu

Oslo   

Ole Dorholt, Anders Fylling, Torkjell Huse, Heidi Sandaker

Uppsala   

Richard Brenner, Lars Eklund, Lars-Erik Lindqvist, Nils Bingefors, Stefan Ehn   

Details of this work can be found in this document:  [word doc]

An overview of the Scandinavian cluster module QA is given here: [pdf] 

2. Steps to have been completed

Production of 5 electrical modules, satisfying every aspect of the electrical and mechanical specifications listed
in SCT-BM-FDR4 and SCT-BM-FDR7. For the summary, including yield, see:

3. Documentation

3(a). Manuals for Operator Use

Additional supporting information:

3(b). Batch traveller procedure

3(c). Procedure for Component Accountability and Yield Statistics

3(d). Visibility of Results to All Barrel Sites

All results for hybrids and modules are visible on the web at:

http://www4.tsl.uu.se/~atlas

 

4. Required Facilities

The appropriate facilities  include: